TUNÇBİLEK THERMAL POWER STATION

Employer : General Directorate of the Turkish Electricity Board (TEK)
Scope : Conversion of the cooling systems of units 4 and 5 from the open cycle to the pure water closed system, and construction, installation and electrical works of the exchanger, the exchanger chamber, the pumps, the automatic measuring and control systems, the pipe equipment, insulation, valves and pure water preparation sections.